City Pedia Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. How the Iowa City Airport plans to 'go green' and save ... - AOL

    www.aol.com/iowa-city-airport-plans-green...

    The Iowa City airport will move half its operation to solar energy by the end of 2024, saving $20K per year. How the Iowa City Airport plans to 'go green' and save $20K a year via solar power Skip ...

  3. Solar power in Iowa - Wikipedia

    en.wikipedia.org/wiki/Solar_power_in_Iowa

    Solar power in Iowa. Solar power in Iowa is limited but growing, with 137 megawatts (MW) installed by the end of 2019 and 27 MW installed during that year, ranking the state 40th among U.S. states. Iowa also generated 0.23% of the state's total electricity production in 2019 from solar energy; an amount sufficient to power over 17,000 Iowa ...

  4. List of power stations in Iowa - Wikipedia

    en.wikipedia.org/wiki/List_of_power_stations_in_Iowa

    In 2021, Iowa had a total summer capacity of 21,771 MW through all of its power plants, and in 2022 Iowa had a net generation of 71,316 GWh. In 2023, the electrical energy generation mix was 59.5% wind, 23.4% coal, 14.9% natural gas, 1.1% hydroelectric, 0.7% solar, 0.3% biomass, and 0.1% petroleum.

  5. Duane Arnold Energy Center - Wikipedia

    en.wikipedia.org/wiki/Duane_Arnold_Energy_Center

    The Duane Arnold Energy Center (DAEC) was Iowa 's only nuclear power plant. It is located on a 500-acre (200 ha) site on the west bank of the Cedar River, two miles (3.2 km) north-northeast of Palo, Iowa, USA, or eight miles (13 km) northwest of Cedar Rapids . DAEC entered operation in February 1975.

  6. What could be nation’s largest solar project planned by feds ...

    www.aol.com/could-nation-largest-solar-project...

    July 25, 2024 at 2:21 PM. The Department of Energy is entering negotiations for one of the largest in the nation, if not the largest, solar and battery storage energy projects to be built at the ...

  7. Here’s how a new Iredell County solar farm could lower ...

    www.aol.com/news/iredell-county-solar-farm-could...

    The solar energy project will cost the city $750,000 annually for up to 20 years and its expected to be completed in November 2023. The city will not incur costs until the solar farm is built.

  8. Ivanpah Solar Power Facility - Wikipedia

    en.wikipedia.org/wiki/Ivanpah_Solar_Power_Facility

    The solar power facility under construction in August 2013. The Ivanpah Solar power project was built on 6 square miles (16 km 2) of public land in the south central Mojave Desert. [ 62] Project construction was temporarily halted in the spring of 2011 due to the suspected impacts on desert tortoises. [ 63]

  9. Wind power in Iowa - Wikipedia

    en.wikipedia.org/wiki/Wind_power_in_Iowa

    Making up over 62% of the state's generated electricity in 2022, wind power is the largest source of electricity generation in Iowa. [1][2]In 2020, over 34 billion kWh of electrical energy was generated by wind power. As of 2022, Iowa has over 12,200 megawatts(MW) of installed capacity with over 6,000 wind turbines, ranking second and third in ...